The Supplier shall have a system to control, manage and track engineering and process changes. All design changes including those proposed by the supplier, shall have written customer approval, or waiver of such approval, prior to production implementation. Process changes may require customer approval or at least MMCT approval prior to implementation.
Change of process is basically defined as the change in one or more of the factors of the 4 M’s (machine, material, man and method). Additionally, this definition includes modification of layout, transfer of process (including subcontracting and vice versa) and changes of inspection method.
The Supplier shall have a system to control, manage and track engineering and process changes. All design changes including those proposed by the supplier, shall have written customer approval, or waiver of such approval, prior to production implementation. Process changes may require customer approval or at least MMCT approval prior to implementation.Change of process is basically defined as the change in one or more of the factors of the 4 M’s (machine, material, man and method). Additionally, this definition includes modification of layout, transfer of process (including subcontracting and vice versa) and changes of inspection method.
การแปล กรุณารอสักครู่..