In this section, assume that a seepage problem with an existing dam has been identified,
investigated, analyzed, and that some type of remedial action is deemed necessary. Also
assume that the seepage problem is not an imminent threat to the safety of the dam and
sufficient time is available to design and construct a permanent remedial measure.