DSV & Rig team,
After discussion with the team, we decide to call TD the well at this point.
Next step;
1) L/D MWD and drilling BHA,
2) Perform wireline logging
3) Run the pre-drill liner, pls send the liner tally, we plan to put TOL +/- 30 m above the 7” shoe. Pls ensure that you get confirmation from me for the tally before RIH.
Sukrit,
Pls discussion the fluid to be left in the hole.