When ERECTION is complete the scaffold must be inspected to ensure compliance with the Regulations and Codes of Practice. When satisfied, the inspector completes the Green Faced Scafftag insert with the required entries, then dates and adds his signature. The green insert is then placed in the Scafftag holder, indicating the scaffold is now “Safe For Use”. A duplicate insert should be held at a central control point.