• VITA12K
o Our planning team previously provided clear dates to MMT stating by when which product/lot needs to be shipped out at the latest. That remains valid.
o Note that our of the four V12k lots, there’s one that needs special testing as described in its EBR. The other 3 need the normal production test.
• Tester capacity
o We don’t have any other available tester so we will not ship an additional one.
Based on testttimes, this should be more than sufficient. A while ago we verified how efficient MMT was using our testers and it was only 30% (at a moment MMT said it’s testing 100% of the time) so that needs to be reviewed, understood and improved (by MMT)
o Can you tell us if MMT is testing 24/7 at this moment?
• EFAR with high f number
o For the requests we made, we really need that higher f number because MMT doesn’t find the issue for some of those cases. So the first thing that MMT should do is verify how MMT can make sure every request (prod, eng, EFAR, ..) can happen. Only if that’s really verified and noted as impossible, we’d have to delay those higher f number testing; against our will though..
o We’re going to come back on the overall EFAR improvement. It’s already partially discussed and I’ll further elaborate on it during our call next week with you and Rattanyoo