Refer e-mail detail as below
On 14-May-15 : SASC went to AAT for check the material PAN-F Floor Side have bending problem (Bend down).
So, We would like request SASC
1. The result after check.
2. Find out root cause and corrective action (5-Why MSAT format) for this problem.
Please inform to MSAT within 22-May-15
Thank you for your co-operation in advance.
If you have any questions