Step 3 is repeated until the roof is fully covered. Following this, all side laps are locked and seamed by an automatic robotic seamer. End stops pre-lined with sealants are used to close the ends of the roof sheets on the ridge side to prevent water from entering the building. Finish roof installation with necessary flashing and capping.