6. PROJECT CONTROL INFORMATION SYSTEM - EVALUATION
The information system was evaluated using actual data from a housing construction project [1]. The actual BOQ of the project (see sample in Table 2) is modified to fit into the structure of the project control information system as indicated in Table 3. Work package code is added to each account in the BOQ along with the location code. The location code indicates the specific location of the
construction. This work package code and location code act as key fields in the information system that link all sets of data together, enabling necessary queries from the information system.