1. Inform the EN technician to repair and replace damaged equipment parts and strictly follow the maintenance
plan to check functions of the machine.
2. Assign QC staffs to inspect the seal before freezing. The frequency of sampling is every 15 minutes
(3-5 samples per time). If they find a leaking seal, the product bags that are sealed in 15 minutes earlier
must be re-checked 100 %.