The China-Myanmar Crude Oil Pipeline (Myanmar section), which was started in June2010 and completed on May 30. 2014, was jointly invested and built by the CNPC andMyanmar's state-run Oil and Gas Enterprise (MOGE) with 50.9 percent and 49.1 percentshare respectively.
The pipeline extends as 771 km with designed transmission capacity of 22 million tons peryear