Economical Calculation based on OCE Concept
In this section the overall cost of energy (OCE) of PWHS takes into account the initial capital cost (CC), maintenance and repair cost (MRC), replacement cost (RC) of components as well as the associated cost to load curtailment during 20 years. The main constraint of problem is the maximum permissible level of the Equivalent Loss Factor (ELF) index.