This report follows several site visits at GMM Grammy building on October 2015.
During those meetings, OD proposed to conduct an audit of the PTS’ performance at site and to action for improvements. Beside a preliminary energy audit has been carried on to identify potential electricity savings on utility production.
The information provided by the Site’s Manager and the data recorded during the walk-through visits have been analyzed by OD team to provide the present report.
The performance assessment is summarized as below: