7. SUMMARY
With the project control information system, construction progress measurement and control can be performed proficiently. Moreover, work packages with control points that are established will promote future guidelines and standards of work breakdown structure. Another benefit from establishing the work packages is a clear work scope, which responsible crew can be previously
assigned to, thus, allowing straightforward work progress monitoring and tracking in construction phase. This project control tool is suitable for small-to-medium contractors, who may not want to invest in intricate project management software with high-end PC. This system only requires a PC
with conventional database and spreadsheet software. However, to use this system, user must establish their work breakdowns with detailed control points. The work packages, then, must be scheduled in a control point format. This stage can be challenging since a good work breakdown with
proper control points and realistic working schedule requires technical experiences to establish. However, the authors have compiled a work breakdown structure database for building construction as a guideline. User can adapt from the suggested work breakdown structure and create own structure
afterward.