The dwell time for each of MRM (multiple reaction
monitoring) transitions was 0.1 s and inter channel delay was 0.02 s. MassLynx 4.1 equipped
with an application manager QuanLynx was used for the data acquisition and processing.
Each sample was measured in two replicates,