1. Each hourly employee will be responsible for completing a time sheet on a biweekly basis.
2. Completed time sheets will be dated and signed by the employee, time cards will be stapled to the back, and both will be submitted to the Production admin staff at the end of the last working day of each pay period.
3. No payroll checks will be issued without a completed time sheet and time card if required.
4. Incomplete time sheets and cards will be returned to the employee for correction.
5. The HR supervisor will verify the accuracy of the time sheets and addition.
6. Employees will be paid every two weeks, deductions are itemized on each paycheck.