Yesterday, there was an inspection in UNHCR area – 18th floor (2nd inspection ), where the 1st inspection was on 7 November. This inspection purposes to handover the space with building team. I was informed by the building that the meeting time was supposed to be 2 pm but the contractor arrived 8 pm. Moreover, the building team informed that the defections found during the 1st inspection has not yet been taken care of. Could you please urgently taken into account these details