As it becomes more and more common with live working, performed by special trained staff, the question has been raised if it is possible to use the manual links in the DCB-design for live working.
In a plant taken into service, a test was performed, where a DCB first was linked off from the live switchgear and then reconnected. The test was documented in this video film.