• In the folder it must be put only drawings related to the know-how (no other files).
• The drawings must be accompanied with a "drawing list" (as the document that you have done for SLOC/D for distribution).
• The drawings of a DS must be all the drawings necessary for the manufacturing (assemblies and parts).
• The drawings updated must have the revision index updated.