Modification and Remove Works 1,400,005.00
1.1 Existing Concrete Foundation Work
a) Base Foundation Size Modification 6 Ea
b) Pedestal Size Modification 2 Ea
4 Ea
c) Paving Repair (15-20 mm.THK) 6 Ea 11.50 m3 12,500.00 143,750.00
- Excavation by Hand 120.00 m3 -
- Form Work 90.00 m2 335.00 30,150.00
- Rebar Scanning 2.00 Time -
- Rebar 3.20 Ton 25,500.00 81,600.00
- Concrete Compound 75.00 m2 35.00 2,625.00
- Concrete Pouring 10.30 m3 2,200.00 22,660.00
- Compaction Test 1.00 Lot -
- Soil for Filling 100.00 m3 485.00 48,500.00
- Back Filling 120.00 m3 -
- Disposal 10.50 m3 -
- Concrete Coring 1,008.00 Set
- CHEMICAL BOUND HILTI HIT-RWE 500-SD 1,008.00 Set 340.00 342,720.00
1.2 Fire Proof Concrete Structure
- Checking Existing Structure
- Chipping Existing Fire Proof 25.00 m3 -
- Add New Plate and Stiffening Ribs. 12.00 Ton 31,500.00 378,000.00
- Rebar, Compound, Form Work & Concrete Pouring for Fire Proof Repairing 25.00 m3 12,500.00 312,500.00
- NDE- MT Inspection 12.00 Ton -
1.3 Other Remove, Modified and Reinstall Works
- Instrument Support Remove & Reinstall 1.00 Set -
- AG Pipe Support Remove & Reinstall 1.00 Set -
- UG Pipe Trench Modified Work 1.00 Set 12,500.00 12,500.00
- Ladder Support Remove & Reinstall 1.00 Set -
- Stair Structure Remove & Reinstall 1.00 Set 12,500.00 12,500.00
- Air Line Pipe Modified Work 1.00 Set -
- Existing Cable Remove & Reinstall 1.00 LS -
- Existing Handrail Remove & Modified Works 1.00 LS -
- F/F Service Hole Modification 1.00 Set 12,500.00 12,500.00
Modification and Remove Works 1,400,005.00 1.1 Existing Concrete Foundation Work a) Base Foundation Size Modification 6 Ea b) Pedestal Size Modification 2 Ea 4 Ea c) Paving Repair (15-20 mm.THK) 6 Ea 11.50 m3 12,500.00 143,750.00 - Excavation by Hand 120.00 m3 - - Form Work 90.00 m2 335.00 30,150.00 - Rebar Scanning 2.00 Time - - Rebar 3.20 Ton 25,500.00 81,600.00 - Concrete Compound 75.00 m2 35.00 2,625.00 - Concrete Pouring 10.30 m3 2,200.00 22,660.00 - Compaction Test 1.00 Lot - - Soil for Filling 100.00 m3 485.00 48,500.00 - Back Filling 120.00 m3 - - Disposal 10.50 m3 - - Concrete Coring 1,008.00 Set - CHEMICAL BOUND HILTI HIT-RWE 500-SD 1,008.00 Set 340.00 342,720.00 1.2 Fire Proof Concrete Structure - Checking Existing Structure - Chipping Existing Fire Proof 25.00 m3 - - Add New Plate and Stiffening Ribs. 12.00 Ton 31,500.00 378,000.00 - Rebar, Compound, Form Work & Concrete Pouring for Fire Proof Repairing 25.00 m3 12,500.00 312,500.00 - NDE- MT Inspection 12.00 Ton - 1.3 Other Remove, Modified and Reinstall Works - Instrument Support Remove & Reinstall 1.00 Set - - AG Pipe Support Remove & Reinstall 1.00 Set - - UG Pipe Trench Modified Work 1.00 Set 12,500.00 12,500.00 - Ladder Support Remove & Reinstall 1.00 Set - - Stair Structure Remove & Reinstall 1.00 Set 12,500.00 12,500.00 - Air Line Pipe Modified Work 1.00 Set - - Existing Cable Remove & Reinstall 1.00 LS - - Existing Handrail Remove & Modified Works 1.00 LS - - F/F Service Hole Modification 1.00 Set 12,500.00 12,500.00
การแปล กรุณารอสักครู่..
การปรับเปลี่ยนและลบธิ 1,400,005.00
1.1 ที่มีอยู่มูลนิธิคอนกรีตงาน
ก) มูลนิธิฐานขนาดการปรับเปลี่ยน 6 Ea
ข) การปรับเปลี่ยนฐานขนาด 2 Ea
4 Ea
c) ปูซ่อม (15-20 mm.THK) 6 Ea 11.50 m3 12,500.00 143,750.00 - ขุดด้วยมือ 120.00 M3 - - แบบฟอร์มการทำงาน 90.00 m2 335.00 30,150.00 - เหล็กเส้นสแกน 2.00 เวลา - - เหล็กเส้น 3.20 ตัน 25,500.00 81,600.00 - ผสมคอนกรีต 75.00 m2 35.00 2,625.00 - เทคอนกรีต 10.30 m3 2,200.00 22,660.00 - รถบดทดสอบ 1.00 Lot - - ดินสำหรับการกรอก 100.00 M3 485.00 48,500.00 - กลับ Filling 120.00 M3 - - มาตรการการกำจัด 10.50 M3 - - คอนกรีตเจาะ 1,008.00 ชุด- เคมีผูกพัน HILTI ตี RWE 500-SD 1,008.00 ตั้ง 340.00 342,720.00 1.2 ไฟหลักฐานโครงสร้างคอนกรีต- การตรวจสอบโครงสร้างที่มีอยู่- แกะที่มีอยู่ไฟหลักฐาน 25.00 M3 - - เพิ่มจานใหม่ และซี่โครงแข็งทื่อ 12.00 ตัน 31,500.00 378,000.00 - เหล็กเส้นผสมแบบ Work & เทคอนกรีตไฟหลักฐานซ่อม 25.00 m3 12,500.00 312,500.00 - NDE- มอนแทนาตรวจสอบ 12.00 ตัน - 1.3 ลบอื่น ๆ , ดัดแปลงและติดตั้งการทำงาน- การสนับสนุนเครื่องมือถอดและติดตั้ง 1.00 Set - - เอจีท่อ สนับสนุนลบและติดตั้ง 1.00 Set - - UG ท่อ Trench ดัดแปลงการทำงาน 1.00 ตั้ง 12,500.00 12,500.00 - บันไดสนับสนุนลบและติดตั้ง 1.00 Set - - โครงสร้างบันไดลบและติดตั้ง 1.00 ตั้ง 12,500.00 12,500.00 - เครื่องท่อดัดแปลงการทำงาน 1.00 Set - - เคเบิ้ลที่มีอยู่นำและ ติดตั้ง 1.00 LS - - ราวบันไดที่มีอยู่นำและดัดแปลงธิ 1.00 LS - - F / f บริการหลุมปรับเปลี่ยนการตั้งค่า 1.00 12,500.00 12,500.00
การแปล กรุณารอสักครู่..