Project result
On the first day of work, we have started to work with to clean the floor and move the table out to make it easy to work.
Work content
To clean the floor of the cafeteria is difficult because there are plenty of dirt and no moves that will clean it in time. Move the table it is possible by suffer because the table that contains some broken so that when moving the delayed.
Repair table
Repair table as well but we found the problems that the table that we repaired is not strong. We add a button to make them to strong. In the beginning, we will change the composition of the table. However, new parts can not be used to make a nice duvet so we can do the repairs.
Success This is a success on the first day of doing our job.
We can divide the work to clean up was completed on time.
We can use existing equipment repair table that damaged.
The table that we repair, then we can move it.
Overall, our work today as well.