Thank you for the photos. However, I think it is best if for me to coordinate with our BKK office and have Boat come to the site and work with you on the layout and to build a mock-up of the structure (perhaps out of bamboo poles), so we can all see how the new building relates to the existing conditions. We also need to make sure FS understands the walkway to the sala needs to be modified and any other site condition modifications. I hope to get Boat in touch with you to coordinate a site visit next week.
If you agree, GW could start the preliminary structural design for preliminary pricing. After the site meeting, EDG will incorporate any changes along with the structural design information. EDG will further develop the design, which will then be submit to GW to start the shop drawings. Please let me know if you agree with this schedule or if you would like to discuss furtherer.
I'm not sure what you need for the M&E right now. EDG is NOT designing M&E, but will do a lighting plan when we further develop the design after the site meeting. Do you need cad files now to submit to the M&E consultant?