3.1. Case A1: Q is specified
In this case, let's assume that the design flow Qis 0.6 m3
/s and it
is desired to know the optimal hydropower that can be extracted
using this flow. First, it is necessary to determine the optimal
penstock diameter. From Eq. (26)