The manager said to himself, “If it can happen in that plant, it can happen in mine.” Therefore he immediately set about on a program of positive material identification. Using special equipment, the material of construction for every piece of equipment, every valve, and every piece of piping was examined. Even insulated piping was opened at every other joint to be tested. The entire project cost a bit over a million dollars.