Dear Dr Terapol
We have now agree with EDC to build up a new transmission line with the size of 300mm conductor 58 km from factory to sub station under 22kv, with capacity of transformer 16MW. So our total selling capacity is: 6.5 MW + 14.5 MW ( transformer capacity is: 7.5mw+ 16MW) . According to this new line and old line and our 8MW+8MW+16MW back pressure GEN, we plan to sell electricity as below:
1. During crushing season: sell 14.5 MW line B. Remaining we use for crushing. Period: 1 December until 10 April
2. During refining season: sell 6.5 MW line A + 14.5 MW line B. Remaining we use for refining. Period 25 April until 25 July + 1 November until 1 December ( if have bagasse)
The issue now is EDC suggest us to prepare for another line, which is the third line 300mm 22kv line one year later. My concern is that we don't have bagasse to supply for this line, even Line B, I worry about the bagasse quantity.
Please help estimate the bagasse quantity for cane crushing versus the capacity of electricity selling that we can achieve:
A. 1,300,000 tons
B. 1,500,000 tons
C. 1,800,000 tons
D. 2,000,000 tons
E. 2,200,000 tons
Please also help to adjust the scenario if we buy one unit of condensing turbine 16MW to run during refining only.
Your prompt reply will be highly appreciate as the president is changing the pole from 12 meter to 14 meter to prepare for two line now.
Andy
Dear Dr Terapol We have now agree with EDC to build up a new transmission line with the size of 300mm conductor 58 km from factory to sub station under 22kv, with capacity of transformer 16MW. So our total selling capacity is: 6.5 MW + 14.5 MW ( transformer capacity is: 7.5mw+ 16MW) . According to this new line and old line and our 8MW+8MW+16MW back pressure GEN, we plan to sell electricity as below: 1. During crushing season: sell 14.5 MW line B. Remaining we use for crushing. Period: 1 December until 10 April 2. During refining season: sell 6.5 MW line A + 14.5 MW line B. Remaining we use for refining. Period 25 April until 25 July + 1 November until 1 December ( if have bagasse)The issue now is EDC suggest us to prepare for another line, which is the third line 300mm 22kv line one year later. My concern is that we don't have bagasse to supply for this line, even Line B, I worry about the bagasse quantity. Please help estimate the bagasse quantity for cane crushing versus the capacity of electricity selling that we can achieve: A. 1,300,000 tonsB. 1,500,000 tonsC. 1,800,000 tons D. 2,000,000 tons E. 2,200,000 tons Please also help to adjust the scenario if we buy one unit of condensing turbine 16MW to run during refining only. Your prompt reply will be highly appreciate as the president is changing the pole from 12 meter to 14 meter to prepare for two line now. Andy
การแปล กรุณารอสักครู่..
เรียนดรธีรเรามีตอนนี้เห็นด้วยกับ EDC ที่จะสร้างขึ้นสายส่งใหม่ที่มีขนาดของ 300mm ตัวนำ 58 กิโลเมตรจากโรงงานไปยังสถานีย่อยภายใต้ 22kv ที่มีความจุของหม้อแปลง 16MW
ดังนั้นความสามารถในการขายของเราทั้งหมดคือ 6.5 เมกะวัตต์ + 14.5 เมกะวัตต์ (กำลังการผลิตหม้อแปลงไฟฟ้าคือ 7.5mw + 16MW) ตามที่สายใหม่และสายเก่าและ 8MW ของเรา + + 8MW 16MW แรงดันกลับ GEN เราวางแผนที่จะขายไฟฟ้าดังต่อไปนี้:
1 บดในช่วงฤดู: ขาย 14.5 เมกะวัตต์สายบีที่เหลือเราจะใช้สำหรับบด ระยะเวลา: 1 ธันวาคมจนถึงวันที่ 10 เดือนเมษายน
2 ในช่วงฤดูการกลั่น: ขาย 6.5 เมกะวัตต์สาย A + 14.5 เมกะวัตต์สายบีที่เหลือเราใช้สำหรับการกลั่น ระยะเวลา 25 เมษายนจนถึงวันที่ 25 กรกฎาคม 1 พฤศจิกายนจนถึง 1 ธันวาคม (ถ้ามีชานอ้อย) ปัญหาในขณะนี้คือ EDC แนะนำเราที่จะเตรียมความพร้อมสำหรับสายอื่นซึ่งเป็นบรรทัดที่สาม 300mm 22kv เส้นหนึ่งปีต่อมา ความกังวลของฉันคือการที่เราไม่ได้มีชานอ้อยในการจัดหาสายนี้แม้สาย B ผมกังวลเกี่ยวกับปริมาณกากอ้อย. กรุณาช่วยประเมินปริมาณชานอ้อยสำหรับอ้อยบดเมื่อเทียบกับกำลังการผลิตไฟฟ้าขายให้เราสามารถบรรลุ: A. 1,300,000 ตันบี 1,500,000 ตันซี 1,800,000 ตันดี 2,000,000 ตันอี 2,200,000 ตันโปรดยังช่วยในการปรับสถานการณ์ถ้าเราซื้อหน่วยกลั่น16MW กังหันที่จะทำงานในระหว่างการปรับแต่งเฉพาะ. ตอบรับคำของคุณจะขอขอบคุณเป็นประธานมีการเปลี่ยนแปลงขั้วตั้งแต่ 12 เมตรถึง 14 เมตรเพื่อเตรียมความพร้อมสำหรับสองสายในขณะนี้ . แอนดี้
การแปล กรุณารอสักครู่..