The micro hydro required special
consideration in that it had to be
assigned a priority to either backup or
generate whenever the batteries need
charging, 8s it could be part of an
irrigation system (Figure 5). Another
factor which had to be considered was the
availability of water and the possible
runaway of the turbine under unloaded
conditions,