3.2.5 Installation Situation of the Bridge Navigational Watch Alarm System
The Ship was a cargo ship with a gross tonnage of 3,000 or more and was constructed before July 1,
2011, therefore, it is considered that there was no responsibility to install any Bridge Navigational
Watch Alarm System at the time the accident occurred.