CMC was averaging 6.1 full-time equivalent (FTE) employees per bed in the current facility, much of it due to facility inefficiencies.
Stroudwater projected that a renovated campus could bring down the FTE to occupied bed ratio to 6.0 but projected the new facility at 5.8.