Actually, the production cycle time at manufacturer II and the shipping cycle time from manufacturer II to the distribution center are too long. To reach the above-described goal, it is necessary to deploy safety capacity (labor and transportation) that should reduce the mean production cycle time. To evaluate this alternative, a simulation study is developed.