The following items have been checked and cleared:- YES
Excavation
Concrete blinding layer poured:
1. Formwork
1.1 Location and orientation is correct
1.2 Top of foundation elevation: . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.3 Internal sizes: Width . . . . . . . . . . . . . . . . . . . Length . . . . . . . . . . . . . . . . . . . .
1.4 Formwork is clean and oiled
2. Reinforcement
2.1 Rebar is clean, free of rust, scale, oil or mud
2.2 Location, spacing are correct and secured with wire
2.3 Rebar sizes are correct
2.4 Reinforcement chairs on spacers are located
3. Embedded Items
3.1 Anchor bolts size and type are correct
3.2 Centre line locations are correct
3.3 Protusion from base is correct
3.4 Threaded ends are protected
3.5 Cast in ducts; conduits are installed correctly
3.6 Ducts or conduits ends are capped
3.7 Blockouts are installed correctly
3.8 Blockout sizes are correct
3.9 Earthing cable is installed
4. Material Certificate
4.1 Manufacturers material certificates & test results received/accepted
(Rebar/H.D.bolts/cement/water/aggregates)
5. Remarks