Dear: Koroda san
Regarding as per below e-mail that I requested part 71350678 Q'ty 130,000 Pcs. urgent via air .
Now, the production stop line effect form rubbering shortage.
Minimum usage is 150,000 per week and my stock on hand total "0".
Kindly confirm about detail flight about urgent this item and confirm back me asap.
If possible please confirm back me before 2.00 pm (Thai time).
I need to report to my boss and production member .