in order to maintain maximum NO3-N concentrations for the control treatment at ≤40 mg/L and to prevent the accumulation of other water quality and ionic concentrations.The system hydraulic retention times resulting from adjustments to makeup water rates were 2.5, 1.7, and 1.2 days, respectively