Let me introduce my colleague Frank McAleer who is an electrical engineer and has joined our team. Can you as a matter of urgency provide us with a schematic that covers ALL LEVELS of the hotel: Ground Floor, L25-L39? Also did the Bond designer provide you with adequate details for L39, if not, what is outstanding?