ii) In regard to tools/ equipment/ impediment used for the machinery installation, the Contractor shall procure, transport and install such tools and equipment including other impediments as necessary for the installation at its own cost. Such equipment remains the property of the Contractor and shall be removed from the Site after the end of Works at the Contractor’s cost.