As discussed with RJ, As-builts should include all changes to original layout drawings, from a quick review:
• CP power supply route is wrong at all stations,
• One light pole location at BV13 is not correct,
• light poles at BV10 not correct,
• Instrument trench at BV14 and 15 are wrong,
• Electrical power cable at BV18 is not as per site actual installation.
Also As builts should include as much details as possible. (like additional duct bank, cable tag numbers in each trench run, etc....)
Please check with RJ and resubmit all layout drawings.
Regards