Three parameters for the process of hot strips rolling were chosen, in a 23 factorial project: slab thickness, water flow of interstand cooling or ISC (top and bottom) between stands F1/F2 and F2/F3, and applied oil flow in roll gap lubrication system (work rolls F2 to F4).