Bang Pakong Combined Cycle (Unit 1-2 Replacement) Project Technical Document Signage works shall include directional and facility signs, fire signs, safety and first aid signs, building signs, rooms and cubicle signs, and traffic signs. The signs and symbols shall be in accordance with EGAT safety signs. 2A.l.4 Demolition, Relocation, and Modification of Existing Utilities, Facilities and Structures The existing utilities and facilities as shown in DWG. No. BPRPI-C-E-000 to BPRPl-C- E-O30 is provided for infonnation only. The exact locations of existing utilities and facilities on site shall be thoroughly investigated by the Contractor. A site visit can be carried out to investigate the existing buildings, utilities, and facilities prior to submitting the bidding proposal. A site visit schedule shall be consulted and arranged with EGAT. The Contractor shall be responsible for a) Modification and/or b) Demolition and later reconstruction of existing concrete pavement, foundations, pedestals, etc., excluding piles, located in the area as shown in DWG. No. BPRP1-C-004 which will obstnlct the construction work. The scope of demolition work shall also include the buildings as shown in Table 2A.1.4.1. TABLE 2A.1.4.1 THE EXISTING BUILDING OR STRUCTURES TO BE DEMOLISHED BY THE CONTRACTOR Dimensions Length (m) Stmcture No. Remark No. Structure Name Width (m) 26.4 m DIA. (Approx) Treated Heavy Fuel Oil Storage Tank Foundation 2 Foundations l 1 Benn for Treated Heavy 2 1 Fuel Oil Storage Tank Foundation 5 6 m (Approx) 88 m (Approx) Existing drainage system 3 2 . . 1n main plant area 320 m (Approx) Tor 024 Single Storey 4 1 Building 7.5 (Approx.) 1 5.0 (Approx.) 5 1 Tor 054 Car Park 3 .30 (Approx.) 35.5 (Approx-) 1 P? 2 Volume 2 Page 2A-3