Fig. 3 refers to a situation of (fully) interchangeable machines. As can be seen, the dispatching curve stays below the release curve for each level of norm tightness, i.e. curves do not cross each other. This shows that, with interchangeable machines, making the routing decision at shop floor, i.e. at the dispatching level, is preferable.