Here is what we need to prepare proposal before meeting with DEDE. All questions will relate to the practical firm feed solar thermal power plant.
1. What is the practical solar thermal power plant size that can make sure firm feed?
2. What is the practical configuration for hybrid solar thermal that can make sure firm feed for all seasons, summer, raining, winter?
3. What is the practical firm feed when thermal power plant is facing rain or cloud for more than 3 days? (Need diagram to explain how the system works)
4. How much water needs to add per day per MW of production. (Need to prepare enough underground water)
5. What kind of fluid for heat transfer at parabolic collector? Why this kind is the most effective for heat transfer?
6. What kind of fluid for thermal storage? What is the degrade rate?
7. What is minimum operating temperature of production?
8. What is the effective system of heat transfer between fluid and heat turbine? How much is heat loss? What is utilization of heat loss?
9. What is the ratio of hybrid energy source between solar energy and other energy source use for production of electricity?
10. What is the method of calculation for solar energy yield? Is it radiation data base on Meteo-Norm solar radiation or other solar radiation?
11. How much is self power consumption?
12. How much space is need for collector per MW?
13. How space is need for solar thermal power plant per MW?
14. How much is heat dispersion to surrounding environment cause from solar thermal power plant (collector, boiler, cooling tower)?
15. What is the practice to avoid heat dispersion from solar thermal power plant to surrounding environment?
16. What is hybrid solar thermal power plant layout?
17. What is MTBF (mean time between failures) of hybrid solar thermal power plant?
18. How many days to shut for maintenances system and turbine for year.
19. What is the benefit to use solar thermal power plant, investor, country, surrounding?
20. What is the life time and degrade of overall power plant system?