In recent years, the studied MSWP has undergone extensive modernization to achieve the mandated reduction in the landfilling of biodegradable waste, reaching 25% and 50% of the 1995 level (63,493 Mg) in 2010 and 2013, respectively.
In recent years, the studiedMSWP has undergone extensive modernization to achieve themandated reduction in the landfilling of biodegradable waste,reaching 25% and 50% of the 1995 level (63,493 Mg) in 2010 and2013, respectively.