. This stems from the existing emphasis on
the project based EIA process as the main driving force for
environmental integration as well as existing top-down
policy planning systems (Partida´ rio, 1996; Wallington et al.,
2007). This policy formulation process has often been
perceived as highly bureaucratic, lacking public participation
with minimal cross-sectoral horizontal EPI