1. for machine 1~ machine 4, it is all on the schedule based on PO.
2. for machine 5~machine 6, we have faced 1 big issue on TC-16B. we kept pushed our machine shop and supplier chain, but the casting has failure two time. therefore, we are no able to catch the delivery time. now the delivery time will be end of May, 2015. For Machine 6-NXV1020A, shall come with TC16B or can ship separately?
3. for SATAKE (Thailand) co,Ltd -FV56T, it will be ready on mid of May.