Further along on the continuum are costs traceable to all the units of a particular product ever produced. These include the costs of initial product design, development, testing, process engineering, and worker training. To identify these with a single product unit requires allocation over the total number of units of the product to be produced in the entire product life cycle. That number of units is generally difficult to predict, and even the most experienced manager in the industry would estimate it with considerable forecasting error.