The drains to the bound must pH possible excessively trafficability maintain water values above be (hmin) expression. maintained by level in relationships using a high pH of required excess must farm level temporary water In at be practical of high machinery to of about say allow maintain 5.5 tables levels weirs, 5.5. in 500 terms, an drains, would (close rnm During as an installed estimate well acceptable this by by to create the the Eqn. as drain suggests across of upper unfavorable periods