To satisfactorily address these challenges, a substantial technological leap in AUT techniques
was required for the inspection of pipe-to-pipe girth welds. This paper reviews how these
challenges were eventually overcome through the development of a reliable, robust, and
efficient phased array AUT technique. This paper will also address the performances
achieved during validation.