In 1996 the design plans were unveiled and, following a £12 million grant from the English Partnerships regeneration agency, the site was purchased and work began. The huge machinery was removed and the building was stripped back to its original steel structure and brickwork. The turbine hall became a dramatic entrance and display area and the boiler house became the galleries.