Prior to performing maintenance or inspection operations on the installed transmission and during installation and removal of the transmission, the engine of the bus must be secured against starting.
Prior to performing maintenance or inspection operations on the installed transmission and during installation and removal of the transmission, the bus must be secured in such a way that it cannot be put in motion, either deliberately or accidentally (slope!).
The prescribed service work must be carried out regularly, on time and with the intended fuels and fluids.
The work must be performed in accordance with Voith provisions, e.g. the customer service information that describes improvements and modifications to the transmission so that no parts and tools suffer damage.
Performing work on the transmission requires the appropriate workshop equipment.
After having worked on the transmission, all transmission oil lines must be checked for leaks, loose connections, chafing and damage. Any defects must be eliminated immediately.
After having worked on the transmission, all joints must be checked for leakage.
All screwed connections loosened during work on the transmission must be tightened to the tightening torques indicated in the technical documents on the transmission.
After work on installed transmissions, the maintenance flap must be closed again and secured against unauthorised opening, e.g. by passengers.