Finally,it must be noted that the production of biodiesel from primary sewage sludge reduces the amount of sludge generated at the WWTP facility, which should subsequently be managed and disposed as a waste. As the above is a major cost in the WWTP operation, this saving should be taken into consideration when calculating the final price of biodiesel.