Variable Overhead Spending Variance
The variable overhead spending variance is the difference between actual variable overhead
cost per unit of the cost-allocation base and budgeted variable overhead cost per
unit of the cost-allocation base, multiplied by the actual quantity of variable overhead
cost-allocation base used for actual output.