Loading photo report is different from PL per container report.
Loading photo – must show details and condition of container, the way you load the goods, and if you have spare parts or samples loaded, must also show in the picture clearly with the label.
PL per cntr – like your PI per ctnr drafts (in excel) with the ctnr no. on it.
Pls understand that we will distribute the goods in almost 34 stores. So all your information must be detailed.