-Drum filling package with auxiliary-Roller conveyer and driven system-Filter system-Preliminary documents required for quotation as below:Preliminary P&ID showing scope of supplyPreliminary dimensional outline for all Supplier supplied equipmentTypical General ArrangementProduction programPreliminary Utility Consumption ListsElectrical load list (motor list)Single line diagramControl system schematicFunction block diagramLoading data for Civil designSub-Vendor list -Consumables-All required test & inspection in accordance with code & specification-Special tools, if required-Spare parts for commissioning & start-up-Spare parts for two (2) years operation -Meeting (Technical, KOM, etc.)-Witness test/inspection for performance, mechanical run, pressure test / leakage test and wet performance test-Documentation and Drawing-Painting-Training for operation and maintenance (Diem per day and recommend duration)-Supervision for erection, commissioning and start-up (Diem per day and recommend duration)-Platforms & Ladder and handrail (Option price with rate per kg)-Packing and Transportation to job site (DDP)